Sign In | Join Free | My fazendomedia.com
China Daoyunai Energy Saving Technology Limited logo
Daoyunai Energy Saving Technology Limited
Committed to underground pipeline CIPP and CCTV
Verified Supplier

4 Years

Home > UV Cured CIPP >

Sewer Cured In Place UV CIPP Pipe Repair Equipment Private Households Public Integrated

Daoyunai Energy Saving Technology Limited
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Sewer Cured In Place UV CIPP Pipe Repair Equipment Private Households Public Integrated

Brand Name : DAO

Model Number : D919

Place of Origin : Jiangsu, China

MOQ : 1 unit

Price : Variable

Payment Terms : T/T

Supply Ability : 20 units per month

Delivery Time : 25 working days

Packaging Details : Normal

Application : Sewer rehabilitation

Composition : Two Blowers, Cable, Video, Cure

Cable reel : 150 meters

Power : Energy Saving LED

Range : DN200-1200

Color : Blank or printed as required

Contact Now

Integrated CIPP UV repair equipment for private households and public pipelines

Pulling CIPP UV liner into the pipeline

1. Place the hoist on the wellhead to align the reel with the guide wheel, and the personnel at both ends can start the hoist to pull materials when they are ready.

2. During material delivery, ensure that the materials are folded neatly and are not scratched by foreign matters during material movement, especially at the wellhead and nozzle. (you can brush lubricant under the material to reduce the resistance of pulling the material).

3. The pulling speed shall be controlled within 5m/min.

4. If space permits, try to leave a certain distance between the steelhead and the pipe orifice to ensure that the finished incision is beautiful. When the material is approaching the end, do not pull too much, otherwise, it is very troublesome to pull the material backward. The hoist can be stopped when the material is pulled down to a proper position.

5. Remove the rope for pulling materials, rope tightener, lifting belt, universal shaft, and guide wheel, and put them back in the original place for next use. (when pulling the material, it is better to keep the material tight and observe whether the bottom film is pulled).

6. Repair the pipes of DN600 and below. The length of the two ends of the inner liner extending out of the original pipe is about ≥ 600mm. Repair the pipes of DN600 and above. The length of the two ends of the inner liner extending out of the original pipe is about ≥ 1000mm.

It depends on the site conditions.

Winch Required 5T
Speed Within 5m/min
Key points slowly and carefully

Sewer Cured In Place UV CIPP Pipe Repair Equipment Private Households Public Integrated


Product Tags:

cured in place pipe repair

      

cipp sewer repair

      

DAO ultraviolet curing equipments

      
Best Sewer Cured In Place UV CIPP Pipe Repair Equipment Private Households Public Integrated wholesale

Sewer Cured In Place UV CIPP Pipe Repair Equipment Private Households Public Integrated Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Daoyunai Energy Saving Technology Limited
*Subject:
*Message:
Characters Remaining: (0/3000)